Skip to content

Earn from every boiler you soldComing soon

See a boiler trip before the plant calls

A gateway on the boiler’s control panel will send pressure, temperature, drum level, fuel feed and alarms to the desk. Your service team sees trouble building, and the plant gets a call before it gets a breakdown.

  • Coming: live readings from the control panel
  • Coming: alarms that open a service request on their own
  • Coming: monthly running reports for AMC customers
  • Join the list to hear first
The Boiler Desk

Remote monitoring

How it works

  1. Today: service by QR and the due list

    Plants ask for service from the nameplate, and the desk lists AMC visits and renewals as they fall due.

  2. Planned: connect a gateway

    A gateway on the control panel sends readings to the desk.

  3. Planned: alarms to requests

    An alarm opens a service request on the boiler, for your team to act on.

  4. Planned: monthly reports

    Each boiler under AMC gets a monthly summary of how it ran: hours, alarms, pressure and level trends, for the plant head and your service manager.

  5. Planned: plan visits on use

    AMC visits scheduled on running hours as well as the calendar, so busy boilers are seen sooner.

Who it's for

Makers who want to offer a premium AMC with monitoring, and plants that run boilers around the clock where an unplanned stop costs a shift of production. It will also suit plants with several boilers and a single service contract, where knowing which boiler is struggling saves a wasted trip.

Why it matters

Most breakdowns announce themselves: a feed pump that takes longer to build level, a draft that drifts, a pressure that sags. Seeing those readings remotely turns a breakdown visit into a planned one, and gives an AMC customer a reason to renew. For the plant, it means fewer surprises and a record of how the boiler has run, which helps when planning shutdowns and inspections. For you, it turns an AMC from scheduled visits into a service that watches the boiler between them, which is easier to price and to renew. It also gives the maker evidence. When a plant says the boiler is underperforming, readings over weeks show whether the cause is the boiler, the fuel or how it is being run.

Today, and planned

  • Works today: service requests from the boiler

    The plant reports a problem from the nameplate QR, urgent ones first.

  • Works today: AMC visit planning

    Visits spread over the contract year, listed before they fall due.

  • Planned: live readings

    Pressure, temperature, level and fuel feed, per boiler.

  • Planned: running reports

    A monthly report for each boiler under AMC.

  • Planned: alarm escalation

    Urgent alarms page the engineer on duty, the same way urgent service requests are flagged today.

  • Works today: the boiler's history

    Every request and visit on the boiler's record, ready for the readings to join it.

  • Planned: running hours

    Hours run per day and month, for planning AMC visits on actual use rather than the calendar.

FAQ

Questions owners ask

Can the desk read my boilers today?
Not yet. Today plants report problems from the nameplate QR and the desk plans AMC visits. Remote readings are coming.
Which control panels will it work with?
We are starting with common panel controllers used on Indian boilers. Join the list and tell us what you fit, so we support it first.
How do I hear when it is ready?
Join the list on this page and we will email you.
Will the plant see the readings too?
That is the plan: the boiler's nameplate page will show its own readings to the plant, while your team sees every boiler you monitor.
Will it need internet at the plant?
The gateway will need a mobile data or plant network connection to send readings. Plants without one keep using the nameplate QR to ask for service.